The Contour Survey in Dhaka Diaries
It varies from 20 m to a hundred m. Nearer intervals are expected if floor level may differ abruptly. The cross- sectional line need not be generally be at proper angles to the main line. This process is ideally suited to highway and railway projects. Radial Line ApproachAmong the major functions of contour traces is to point ground elevation or de